![]() ![]() ![]() ![]() |
![]() Lake Texana PipelineUrban Engineering did the surveying construction plan and specification work on the first third of this 90-mile pipeline from Lake Texana near Victoria to the O.N. Stevens Water Treatment Plant in the Calallen area of Corpus Christi. Work on this 60-inch diameter pipeline included two major river crossings that required directional borings at both crossings. |
![]() ![]() |